HAND-SCRAPED FLOORING INSTALLATION INSTRUCTIONS
Hardwood flooring should be one of the last items installed in any new construction or remodel project. All work involving water or moisture should be completed before flooring installation. Water and wood do not mix. Installing flooring onto a wet subfloor will most likely cause cupping, tip & edge raising, telegraphing of core and subsequent gapping.
Permanent HVAC should be on and operational and maintained between 65-75 degrees Fahrenheit with relative humidity of 35%-55% for a minimum of 7 days prior to delivery, as well as during and after installation of the flooring. When installing over radiant heat, additional restrictions apply.